Questions
Electric Slide Gates: Common Questions
How much does electric sliding gate installation cost in Austin?
Opening width and gate weight come first, since they decide the steel, the track length and the motor size. The concrete track bed and the power run to the operator pad come next, and the free visit gives you one written figure for all of it.
Tracked or cantilever: which do I need?
A tracked gate suits a flat, paved drive and costs less to build. A slope, gravel or debris-prone drive is better served by a cantilever gate, which needs no ground rail.
How much room does a slide gate need?
Plan on a clear, level run beside the opening a little longer than the gate itself. We measure it on site.
Will heavy rain stop my gate?
Not when the track is drained. We raise or slope the track bed and add drainage slots so storm water and silt clear the rail.
What happens in a power outage?
A battery backup keeps the gate running through most outages, and every operator has a manual release so you can open it by hand.
Is a slide gate good for a business yard?
Yes. Tracked slide gates handle wide openings and high daily traffic well, with a commercial-duty operator sized to the cycle count.
How long does installation take?
A site visit is usually possible inside a few business days. The gate itself takes a few weeks in the shop, then the track pour and operator setup typically take two to four days on your drive, all estimates on your quote.
Is the installation covered by a warranty?
Yes. A written warranty covers the slide gate, the track work and the operator setup, and you can read its terms on the quote before you sign anything.